NEWS

TCN Restores Power Supply In Some Northern States

 

The Transmission Company of Nigeria (TCN) says it has successfully restored bulk power supply through its 330kV Ugwuaji-Apir transmission line 1 as of 4:56 pm on Wednesday, following the completion of repairs on the vandalized section of the line.

This was disclosed in a statement signed by the spokesperson of the TCN, Ndidi Mbah, on Wednesday.

“With the restoration of this line, the Apir-Lafia 330kV transmission line 2 is now operational, also, bulk power transmission has been restored to Lafia, Makurdi, Jos, Kaduna, Kano, Bauchi, and Gombe States.

“As restoration efforts continue, with the TCN engineering team preparing to commence work on the second 330kV transmission line. All necessary materials for the repairs are on hand, and work will begin as soon as the site is secured for the safety of our personnel to the affected sections of the vandalized 330kV transmission line two,” the statement read in part.

It noted that in the meantime, teams of linesmen will re-patrol the 330kV line 2 to ensure that no other sections are impacted as the repair works progress.

“We appreciate your patience and understanding as our engineers work diligently to restore the 330kV transmission line 2. TCN recognizes the importance of electricity in our daily lives and is committed to ensuring that this line is repaired swiftly, thereby increasing the bulk power to the affected area by the incident,” it added.

The northern region has been without electricity for over a week. The outage was said to have been triggered after the tripping off of the 330kV circuit transmission line between Benue and Enugu.

ALSO READ  2023: How I Made Buhari President- Tinubu

The transmission line between Shiroro and Kaduna was also affected, affecting Kano, Gombe, Kebbi, Jos, Kaduna, Benue, Bauchi, Adamawa, Taraba, Borno, Kwara, Nasarawa and Yobe.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button